Calgary Traffic Corridor

Macleod Trail

28 km corridor · Approximately 60,000 vehicles/day near 162 Avenue; higher through the Heritage Drive commercial strip

Checking live status…

Conditions now on Macleod Trail

Yellow warning – snowfall in effect Details at weather.gc.ca

Light snow −0.4 °C Wind chill −4 Environment Canada report, 12:26 PM

Today: Snow. Amount 5 cm. High plus 1.

Tonight: Cloudy. 30 percent chance of flurries this evening. Fog patches developing late this evening. Wind up to 15 km/h. Low minus 2. Wind chill near minus 6.

Road surface

Macleod Trail is a City road. The City posts its snow and plow updates here:

Weather: Environment and Climate Change Canada (data licence). Shown as published.

Cameras

Cameras along Macleod Trail

23 City of Calgary traffic cameras, north to south. Tap one for a larger view that updates every 30 seconds.

See all Calgary cameras
Images: City of Calgary traffic cameras.
Drive time

Your commute on Macleod Trail

Each button opens the route with its drive time right now.

Usual peak hours

Morning rush
7:00 – 9:00 AM
Midday
11:30 AM – 1:30 PM
Evening rush
4:00 – 6:30 PM

Macleod Trail has a unique midday traffic peak due to commercial density. Signal-controlled intersections throughout cause stop-and-go traffic. The Heritage Drive to Anderson Road stretch is consistently the most congested.

Live Events

Current Activity on Macleod Trail

Loading live traffic events…
Overview

About Macleod Trail

Macleod Trail (Highway 2A) runs approximately 28 kilometres from downtown Calgary south to Stoney Trail, serving as one of the city’s longest and most commercially developed arterials. The heavily signalized route features Canada’s first diverging-diamond interchange at 162 Avenue and transitions from an urban boulevard to an expressway south of Anderson Road.

Length 28 km
Daily Traffic Approximately 60,000 vehicles/day near 162 Avenue; higher through the Heritage Drive commercial strip
Intersections

Key Intersections

1 9 Avenue SE (downtown, northern terminus)
2 25 Avenue SE (Stampede Park area)
3 Glenmore Trail (single-point urban interchange)
4 Heritage Drive SE (signalized — one of the most congested intersections)
5 Southland Drive SE
6 Anderson Road SE (partial cloverleaf interchange)
7 Shawnessy Boulevard
8 162 Avenue / Sun Valley Boulevard (Canada’s first diverging-diamond interchange)
9 Stoney Trail (free-flowing combination interchange)
Construction

Major Projects

Macleod Trail SE Median Barriers Project

Installing median barriers from Shawnessy Boulevard to 99 Avenue, with curb replacement and resurfacing. Southern section completed October 2025; northern section with Bannister Road Bridge rehabilitation continuing through 2026.

Green Line LRT (adjacent corridor)

The Green Line southeast segment broke ground June 2025. While not directly on Macleod Trail, it runs parallel through parts of the corridor and will impact nearby traffic patterns.

Speed

Speed Limits

50 km/h from downtown to approximately 39 Avenue (Beltline / Manchester)
60 km/h from 39 Avenue through Chinook area to Heritage Drive
60–70 km/h from Heritage Drive to Anderson Road
80 km/h from Anderson Road south to Stoney Trail
100 km/h south of Stoney Trail to city limits
Traffic events come from 511 Alberta and the City of Calgary's open data, refreshed every 15 minutes. Camera images are the City of Calgary's. Weather, warnings and forecasts are from Environment and Climate Change Canada (data licence). Contains information licensed under the Open Government Licence – City of Calgary. Details are shown as published by each source and may contain errors or omissions.
For Business Owners

Own a business in Calgary?

Your listing is already in our directory. Claim it free to add hours, photos, and contact info — or upgrade to Featured for top placement in your category and neighbourhood.