Calgary Traffic Corridor

Crowchild Trail

22 km corridor · 101,000–107,500 vehicles/day at the Bow River bridge (busiest section)

Checking live status…

Conditions now on Crowchild Trail

Yellow warning – snowfall in effect Details at weather.gc.ca

Light snow −0.4 °C Wind chill −4 Environment Canada report, 12:26 PM

Today: Snow. Amount 5 cm. High plus 1.

Tonight: Cloudy. 30 percent chance of flurries this evening. Fog patches developing late this evening. Wind up to 15 km/h. Low minus 2. Wind chill near minus 6.

Road surface

Crowchild Trail is a City road. The City posts its snow and plow updates here:

Weather: Environment and Climate Change Canada (data licence). Shown as published.

Cameras

Cameras along Crowchild Trail

10 City of Calgary traffic cameras, north to south. Tap one for a larger view that updates every 30 seconds.

See all Calgary cameras
Images: City of Calgary traffic cameras.
Drive time

Your commute on Crowchild Trail

Each button opens the route with its drive time right now.

Usual peak hours

Morning rush
7:00 – 9:30 AM
Evening rush
3:30 – 6:00 PM

Bottlenecks form at the University Drive merge, the Bow River crossing, and the 24th Avenue / Kensington area. The 16 Avenue interchange, built in the 1960s, is one of Calgary’s most infamous pinch points.

Live Events

Current Activity on Crowchild Trail

Loading live traffic events…
Overview

About Crowchild Trail

Crowchild Trail is a 22-kilometre arterial and expressway connecting southwest Calgary to the northwest, carrying over 100,000 vehicles per day at its busiest point — the Bow River bridge. The corridor passes through the University of Calgary area and serves as the primary commuter link between southwest residential communities and the university/hospital employment node.

Length 22 km
Daily Traffic 101,000–107,500 vehicles/day at the Bow River bridge (busiest section)
Intersections

Key Intersections

1 Glenmore Trail (flyover interchange)
2 Flanders Avenue SW (overpass)
3 33 Avenue SW (overpass)
4 17 Avenue SW (overpass)
5 Bow Trail / 10 Avenue SW (system interchange)
6 Memorial Drive interchange
7 16 Avenue NW / University Drive (interchange complex — major bottleneck)
8 24 Avenue NW / Charleswood Drive
9 Nose Hill Drive NW
10 Stoney Trail (modified cloverleaf)
Construction

Major Projects

Crowchild Trail NW Ramp Resurfacing

Ramp resurfacing starting May 2026 at Shaganappi Trail, 53 Street NW, Sarcee Trail NW, Nose Hill Drive NW, and Crowfoot Parade NW. Nighttime work only to minimize commuter disruption.

Long-Term Corridor Upgrade Plan

A $1.3-billion program for major corridor upgrades to a minimum six-lane standard throughout. Implementation anticipated beyond a 10-year horizon.

Speed

Speed Limits

80 km/h on the south freeway section (Glenmore Trail to Bow River)
60 km/h through the 16 Avenue / University Drive interchange area
70–80 km/h on the north expressway (University to Nose Hill Drive)
60 km/h north of Nose Hill Drive (narrows to 2 lanes)
Traffic events come from 511 Alberta and the City of Calgary's open data, refreshed every 15 minutes. Camera images are the City of Calgary's. Weather, warnings and forecasts are from Environment and Climate Change Canada (data licence). Contains information licensed under the Open Government Licence – City of Calgary. Details are shown as published by each source and may contain errors or omissions.
For Business Owners

Own a business in Calgary?

Your listing is already in our directory. Claim it free to add hours, photos, and contact info — or upgrade to Featured for top placement in your category and neighbourhood.