Calgary Traffic Corridor

Sarcee Trail

18 km corridor · Exceeding 35,000 vehicles/day on the busiest sections

Checking live status…

Conditions now on Sarcee Trail

Yellow warning – snowfall in effect Details at weather.gc.ca

Light snow −0.4 °C Wind chill −4 Environment Canada report, 12:26 PM

Today: Snow. Amount 5 cm. High plus 1.

Tonight: Cloudy. 30 percent chance of flurries this evening. Fog patches developing late this evening. Wind up to 15 km/h. Low minus 2. Wind chill near minus 6.

Road surface

Sarcee Trail is a City road. The City posts its snow and plow updates here:

Weather: Environment and Climate Change Canada (data licence). Shown as published.

Cameras

Cameras along Sarcee Trail

8 City of Calgary traffic cameras, north to south. Tap one for a larger view that updates every 30 seconds.

See all Calgary cameras
Images: City of Calgary traffic cameras.
Drive time

Your commute on Sarcee Trail

Each button opens the route with its drive time right now.

Usual peak hours

Morning rush
7:00 – 9:00 AM
Evening rush
3:30 – 6:00 PM

Southbound morning traffic from Tuscany and Scenic Acres creates congestion approaching 16 Avenue. Bow Trail SW and Richmond Road SW intersections are notable bottlenecks awaiting future interchanges.

Live Events

Current Activity on Sarcee Trail

Loading live traffic events…
Overview

About Sarcee Trail

Sarcee Trail is an 18-kilometre north-south arterial and expressway in northwest Calgary, split into two halves by 16 Avenue NW. The southern half features three interchanges and serves as a signed bypass route between Highway 1 west and Highway 2 south, while the northern half connects Silver Springs and Scenic Acres to newer communities like Nolan Hill.

Length 18 km
Daily Traffic Exceeding 35,000 vehicles/day on the busiest sections
Intersections

Key Intersections

1 Glenmore Trail / Stoney Trail (cloversack interchange, opened 2020)
2 Richmond Road SW (signalized — future interchange planned)
3 17 Avenue SW (interchange)
4 Bow Trail SW (signalized — interchange planned, $336.5M)
5 Old Banff Coach Road (interchange)
6 16 Avenue NW / Trans-Canada (interchange)
7 Nose Hill Drive NW
8 Stoney Trail (northern terminus area)
Construction

Major Projects

Sarcee Trail / Bow Trail SW Interchange

Functional planning study completed spring 2025. Recommended design estimated at $336.5M. Funding to be sought in the 2027–30 budget cycle. Major construction not expected until after 2027.

Sarcee Trail / Richmond Road SW Interchange

Functional planning study completed for a future interchange to replace the current signalized intersection.

Speed

Speed Limits

70–80 km/h on the southern expressway section
60 km/h near Beacon Hill Shopping Centre (northbound)
50 km/h near Beacon Hill Shopping Centre (southbound)
60–70 km/h on the northern section
Traffic events come from 511 Alberta and the City of Calgary's open data, refreshed every 15 minutes. Camera images are the City of Calgary's. Weather, warnings and forecasts are from Environment and Climate Change Canada (data licence). Contains information licensed under the Open Government Licence – City of Calgary. Details are shown as published by each source and may contain errors or omissions.
For Business Owners

Own a business in Calgary?

Your listing is already in our directory. Claim it free to add hours, photos, and contact info — or upgrade to Featured for top placement in your category and neighbourhood.