Calgary Traffic Corridor

Memorial Drive

13.9 km corridor · 30,000–50,000 vehicles/day depending on section (lower on parkway, higher east of Edmonton Trail)

Checking live status…

Conditions now on Memorial Drive

Yellow warning – snowfall in effect Details at weather.gc.ca

Light snow −0.4 °C Wind chill −4 Environment Canada report, 12:26 PM

Today: Snow. Amount 5 cm. High plus 1.

Tonight: Cloudy. 30 percent chance of flurries this evening. Fog patches developing late this evening. Wind up to 15 km/h. Low minus 2. Wind chill near minus 6.

Road surface

Memorial Drive is a City road. The City posts its snow and plow updates here:

Weather: Environment and Climate Change Canada (data licence). Shown as published.

Cameras

Cameras along Memorial Drive

10 City of Calgary traffic cameras, west to east. Tap one for a larger view that updates every 30 seconds.

See all Calgary cameras
Images: City of Calgary traffic cameras.
Drive time

Your commute on Memorial Drive

Each button opens the route with its drive time right now.

Usual peak hours

Morning rush
7:00 – 9:00 AM
Evening rush
4:00 – 6:30 PM

Westbound morning congestion is heaviest as northeast commuters head toward downtown. The Deerfoot Trail interchange and 36 Street intersection are common bottlenecks.

Live Events

Current Activity on Memorial Drive

Loading live traffic events…
Overview

About Memorial Drive

Memorial Drive runs 14 kilometres east-west along the north bank of the Bow River, connecting northwest Calgary to the northeast. The western section is a tree-lined parkway — a living memorial to World War I soldiers with poplars planted in 1922 — that transitions into a freeway east of Edmonton Trail before reaching Deerfoot Trail.

Length 13.9 km
Daily Traffic 30,000–50,000 vehicles/day depending on section (lower on parkway, higher east of Edmonton Trail)
Intersections

Key Intersections

1 Crowchild Trail (interchange — western origin)
2 10 Street NW
3 Centre Street (Langevin Bridge area)
4 Edmonton Trail / 4 Street NE (parkway-to-freeway transition)
5 Deerfoot Trail (interchange)
6 36 Street NE
7 52 Street NE
8 68 Street NE / Stoney Trail area
Construction

Major Projects

Memorial Drive Extension

A $60M+ project extending Memorial Drive eastward from Abbeydale Drive over Stoney Trail, connecting to 84 Street E with a new overpass. Construction anticipated spring 2026.

Sunnyside Flood Barrier

Partially built flood barrier along Memorial Drive in the Sunnyside area, expected completed spring 2026.

Speed

Speed Limits

50 km/h on the parkway section (west of Centre Street)
50–60 km/h urban arterial (Centre Street to Edmonton Trail)
70–80 km/h freeway section (Edmonton Trail to Deerfoot Trail)
60–70 km/h expressway east of Deerfoot Trail
Traffic events come from 511 Alberta and the City of Calgary's open data, refreshed every 15 minutes. Camera images are the City of Calgary's. Weather, warnings and forecasts are from Environment and Climate Change Canada (data licence). Contains information licensed under the Open Government Licence – City of Calgary. Details are shown as published by each source and may contain errors or omissions.
For Business Owners

Own a business in Calgary?

Your listing is already in our directory. Claim it free to add hours, photos, and contact info — or upgrade to Featured for top placement in your category and neighbourhood.